PERI UP - the versatile scaffolding system aids a hospital build in Belfast

Royal Victoria Hospital
Belfast, United Kingdom

A cantilever deck of  30,000m² floor deck slab with concrete-to-floor slab volume of approx. 8,000m³.  

400mm thick RC slab with an additional grid of 2.40m x 2.50m concrete beams on top.

Location

The Project

  

Project Information

"PERI provided a total project solution and delivered excellent quality design."
Michael Lynch
Project Director