Newfoundland

Buildings

Form structures that stand tall

From universities to residential high-rises, we help shape buildings that bring a city to life. With a range of climbing and formwork options to suit your requirements, our temporary works systems make it possible to construct in challenging environments.

Focus Project

Building Projects

Bridge renovation Ponte Rio Tua, Vila Real, Portugal - For the renovation of an arched bridge built in 1940, a scaffold construction on the basis of PERI UP modular scaffolding was erected.
VARIOKIT, the adjustable formwork for tunnel projects supplied by PERI
Metal scaffolding wraps around the side of a multi-storey residential building.
Auditorio de Tenerife, Tenerife, Spain - The Auditorio de Tenerife is used as a concert hall and is an example of the almost unlimited possibilities provided by concrete construction. The formwork technology required for such a structure presented a special challenge which our engineers solved in a rational and safe manner.
PERI CB Climbing System
TRIO Wall Formwork
System
Different PERI wall formwork systems used to construct new tropical enclosure at Chester Zoo
PERI UP - the versatile scaffolding system aids a hospital build in Belfast
RCS supported the spider boom platform to facilitate concrete placement on the core
1277 bespoke VARIO shutters were fabricated and delivered to the site
For these cores on the V&A Stratford project, we provided ‘up and over’ access using our PERI UP Flex scaffold so operatives could gain access from one side of the VARIO formwork shutter to the other. This was crucial as the final floor levels followed up behind the core and were not yet in place.
Edificio Ágora, Valencia, Spain - A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
Mausoleum Michniów - The museum shape symbolizes a traditional village hut, which gradually crumbles into dust. Numerous offsets and inclined surfaces characterize the complex structure. PERI engineers developed a customized formwork concept in order to carry out the project with a minimum quantity of special formwork.
Forum roof Munich Airport, Germany - Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.
Delivering a high-grade architectural finish for a world-changing university.
ADAC Headquarters, Munich, Germany - For the construction of the new ADAC headquarters, PERI supported the Züblin construction team with efficient formwork and scaffolding solutions as well as competent service.
North Station Vienna - The use of efficient formwork systems for the walls and slabs ensured that the very tight completion deadline for the building shell could be met.
PERI CB Climbing System
TRIO Wall Formwork
SKYDECK Slab System
Section of the Stafford Multi-Storey pre-cast car park with PROKIT edge protection
MULTIPROP with SKYDECK for slab formwork from PERI
Steel reinforcement ties the core together
South Quay Plaza
Greenwich Peninsula
Delivering an architectural concrete finish for a 19th century building.
PERI UP Easy Scaffolding was used to replace cladding on The Link residential building in London
Scaffolding used on Payne Road.
Product: DUO Formwork
Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.
VARIO is a high load bearing wall formwork system using PERI GT24 Girders
Versatile falsework from PERI assists construction of new sweet factory
The Mersey Gateway is a cable-stayed bridge stretching over 2,000 m from Runcorn to Widnes
A timber gridshell shapes the undulating roof and gives the distillery its unique geometry
Aberdeen Western Peripheral Route/Balmedie to Tipperty (AWPR/ B-T)
Infrastructure formwork for a driverless rail link service.
Palm paper mill, King’s Lynn, Great Britain - Only 7 months after beginning the excavation and foundation work, the topping-out ceremony took place; 8 months later, production started in August 2009.
The drum formwork was integrated with heavy-duty trusses comprising RCS rail frames and heavy-duty rollers to facilitate movement.
A photo taken in London at the Victoria Embankment. It shows the construction of a shaft to redirect sewage.
One of the most significant infrastructure projects ever undertaken in the UK, London’s Crossrail is a high-frequency, high-capacity service enabling faster travel across the capital.
The efficient PERI UP system is quick and easy to erect, and it provided safe access to the site.
PERI provides the solution for a 36m deep shaft
Rolls Royce, Derby
The Werrington Grade Separation scheme will make way for a new diveunder railway line.
Efficient formwork and falsework for one of Scotland’s busiest roads.
PERI provides a range of formwork and scaffolding products to the new Forth Bridge crossing
Meeting formwork demands on Hinkley Point C
Custom-made cleats realised the unique shape of the piers.
Two 175 m high piers at a distance of 472 m from each other, take the loads of this cable stay construction which connects both sides of the Cooper River.
Czajka Sewage Plant, Warsaw, Poland - In a construction time of only two years, a total of 120 individual structures were built on an area equivalent to 80 football pitches.
Tunnel Limerick, Ireland - Tunnel formwork carriage on the basis of the VARIOKIT civil engineering construction kit for the six additional concreting sections at the southern portal carried out parallel to the construction of the main tunnel elements.
PERI ACS (Automatic Climbing System), deployed with RCS (Rail Climbing System) with VARIO. Shows the very high concrete finish below climbing systems on the North Core.
PERI's climbing protection panel conforms with Health & Safety Fall from Height Regulations
One Park Drive, Wood Wharf
Brunel Building, North Wharf Road
PERI UP Easy provides access on Blake Tower
The solution by PERI is realised in the finish of the concrete walls for the Aquatics Centre for London 2012
LPS - PERI's mesh protection panel ensures safe working conditions in all weathers
PERI finds the right solution for the One Tower Bridge, London construction
Project-specific formwork ascends on MECD’s irregular-shaped cores.
Bespoke formwork delivers unique architectural concrete requirements.
Concrete House, Sussex