The Project
Project Information
I involved PERI very early in the planning of this scheme. PERI offered a complete design service and from their previous experience proposed the CNC cleat boxes to form the complex shapes required. PERI have provided technical representation at meetings and have been very supportive in getting this scheme to fruition. The ability to take the scheme designer’s 3D models and incorporate this into the formwork design has been invaluable in delivering the piers to the shape and function required. The drawings and instructions provided by PERI have made construction by the team on site swift and to a high standard.
Mark Bristow
Contracts Director, Bell Formwork
Are you working on a project like this?
Call us on 01 588 1374 to discuss your requirements further.