The Mersey Gateway is a cable-stayed bridge stretching over 2,000 m from Runcorn to Widnes

Infrastructure

Where smart engineering meets digital expertise

For over 30 years, we’ve been involved in delivering some of the UK’s most complex roads, tunnels and bridges. By using modern technology alongside our trusted temporary works systems, we help you deliver infrastructure that is built to last.

Focus Project

Infrastructure Projects

Motorway bridge over the Drava, Osijek, Croatia - A VARIOKIT cantilevered parapet carriage serves for constructing the external cantilevered parapets.
Two 175 m high piers at a distance of 472 m from each other, take the loads of this cable stay construction which connects both sides of the Cooper River.
Bridge over the Dunajec, Tarnow, Poland - With some supplementary system components, the VARIOKIT engineering construction kit can also be used for the balanced cantilever construction method.
Motorway Bridge D1, Považská Bystrica, Slovakia - The constantly-changing cross-section of the superstructure placed great demands on the VARIOKIT system equipment.
Tunnel Limerick, Ireland - Tunnel formwork carriage on the basis of the VARIOKIT civil engineering construction kit for the six additional concreting sections at the southern portal carried out parallel to the construction of the main tunnel elements.
VARIO is a high load bearing wall formwork system using PERI GT24 Girders
The solution by PERI is realised in the finish of the concrete walls for the Aquatics Centre for London 2012
PERI finds the right solution for the One Tower Bridge, London construction
PERI's VARIO formwork system achieves high concrete finish to Derbyshire Resevoir Walls
Bermondsey Drive Under
Steel reinforcement ties the core together
The Mersey Gateway is a cable-stayed bridge stretching over 2,000 m from Runcorn to Widnes
Aberdeen Western Peripheral Route/Balmedie to Tipperty (AWPR/ B-T)
Infrastructure formwork for a driverless rail link service.
1277 bespoke VARIO shutters were fabricated and delivered to the site
The A52 Clifton Bridge, a major National Highways upgrade project in Nottingham, is a complex structure, which required repairs inside and underneath the bridge to strengthen the concrete.
The drum formwork was integrated with heavy-duty trusses comprising RCS rail frames and heavy-duty rollers to facilitate movement.
A photo taken in London at the Victoria Embankment. It shows the construction of a shaft to redirect sewage.
One of the most significant infrastructure projects ever undertaken in the UK, London’s Crossrail is a high-frequency, high-capacity service enabling faster travel across the capital.
PERI UP Easy provides access on Blake Tower
Edificio Ágora, Valencia, Spain - A huge birdcage scaffold on the basis of PERI UP Rosett provided safe access ways and working areas for subsequent site activities up to a height of nearly 80 m.
Forum roof Munich Airport, Germany - Replacing the membrane was carried out during ongoing daily airport operations. Maximum safety was ensured through a large-area protective roof construction installed at the height of the forum area in addition to the safety netting underneath the scaffolded roof sections.
Project-specific formwork ascends on MECD’s irregular-shaped cores.
The efficient PERI UP system is quick and easy to erect, and it provided safe access to the site.
PERI provides the solution for a 36m deep shaft
PERI UP Modular System Scaffolding was used for the external scaffold around the three digester tanks.
The Werrington Grade Separation scheme will make way for a new diveunder railway line.
Efficient formwork and falsework for one of Scotland’s busiest roads.
PERI VARIOKIT VK-P Platform System
PERI provides a range of formwork and scaffolding products to the new Forth Bridge crossing
VARIOKIT, the adjustable formwork for tunnel projects supplied by PERI
Meeting formwork demands on Hinkley Point C
Bespoke formwork delivers unique architectural concrete requirements.
Custom-made cleats realised the unique shape of the piers.
Within a 2-3 year period, a total of 86,400 flights are simulated which is three times the expected service life. The PERI UP working scaffold allows test preparations as well as continuous measurement and inspection work to be carried out during the EF-2 testing phase.
Auditorio de Tenerife, Tenerife, Spain - The Auditorio de Tenerife is used as a concert hall and is an example of the almost unlimited possibilities provided by concrete construction. The formwork technology required for such a structure presented a special challenge which our engineers solved in a rational and safe manner.
Versatile falsework from PERI assists construction of new sweet factory
A timber gridshell shapes the undulating roof and gives the distillery its unique geometry
Palm paper mill, King’s Lynn, Great Britain - Only 7 months after beginning the excavation and foundation work, the topping-out ceremony took place; 8 months later, production started in August 2009.
Rolls Royce, Derby
Czajka Sewage Plant, Warsaw, Poland - In a construction time of only two years, a total of 120 individual structures were built on an area equivalent to 80 football pitches.
PERI UP - the versatile scaffolding system aids a hospital build in Belfast
LPS - PERI's mesh protection panel ensures safe working conditions in all weathers
Bridge renovation Ponte Rio Tua, Vila Real, Portugal - For the renovation of an arched bridge built in 1940, a scaffold construction on the basis of PERI UP modular scaffolding was erected.